Your result card image — long-press it, then tap “Save image” / “Download image”:
If the automatic download did not appear, this preview is the reliable way to save it on a phone.
4
Refilling — Fresh Water 💧
Refilling is faster than draining — the water comes in under PUB direct / pump pressure, so the flow is high and steady.
Water to refill: 0 m³ (same as Effective Volume — the tank is empty after washing)
🔧
Drain Valve Turns
How many handwheel turns to open the valve to a target % — counted from fully closed.
Turns from fully closed: 3.9 turns (≈ 4 full turns)
Fully open for this valve: 13 turns. ℹ️ Actual Valve Turns vary by valve maker and design — the exact total is on the valve nameplate/datasheet or by counting on site.
?
Notes & how to use
Tap a topic to read it. The calculator above works with reading these — they are here for the site team and supervisors.
🏷️ As shown on the tank label, e.g. 28.3 Sq.m × 3.57 m (H). Volume = Floor Area × EWL.
📏 EWL is the tank height minus about 500 mm as a general rule — do not use the full height.
👁️ Site tanks often differ from theory, so always replace the preset EWL with the level you actually see on the indicator tube when you arrive.
✅ Picking a tank fills in its size and estimated EWL — check it against the tube.
📐 EWL = overflow level − 75 mm: the water level is 25 mm below the warning alarm (7.1.7), which is 50 mm below the overflow pipe (7.1.6).
📏 EWL is set by the overflow/alarm arrangement, not by the tank height — so the '500 mm rule' (EWL = height − 0.50 m) is only a rough preset estimate.
👁️ Always check the preset EWL against the indicator tube on site, or the label EFF. CAP. ÷ floor area (7.2.4).
💧 Outlet is 75–100 mm above the bottom; wash-out pipe is flush with the bottom (7.3.2).
✅ The 150 mm dead water sits above the outlet, so gravity draining works down to dead-water level; the wash-out handles the final dead water during cleaning.
🏷️ Type the EFF. CAP. from the tank label and it is used as the Effective Volume.
🧮 Leave it blank and the volume is calculated from the size × EWL.
💧 The flushing time also needs the water level — enter the EWL from the indicator tube, or the tank size, so the level can be worked out from this capacity.
🔧 On site the valve is usually already set (by the supervisor / client) — measure the drop time at that opening and leave this on “Valve at current setting”: the time is used as measured (×1), so it cannot be counted twice.
📊 Only pick “Valve fully open” when the drop time was measured with the valve fully open and you want to predict a slower, partly-open flush.
⚠️ Only used when the drop time / flow was measured with the valve fully open (see above).
🎚️ Pick the opening you will flush with: Three-quarter open takes about 1.33× longer than Fully open, Half open about 2×, Quarter open about 4×.
🔒 Keep the valve at the same opening while you flush.
⏱️ Watch the Water Level Indicator tube. Start the timer at a level mark, stop it when it has dropped 100 mm.
🔒 Measure at the valve opening you will flush with, and keep that opening the same for the whole flush.
✅ The drop-rate method is best on site when there is no flow meter.
📉 Gravity draining slows as the level falls, so the second drop is usually slower.
🔁 Measure again around the middle of the tank — the calculator averages the two times.
🪣 From a flow meter, or a timed bucket: flow = bucket volume ÷ fill time. E.g. a 20 L bucket in 10 sec = 120 L/min = 7.2 m³/hr.
🔒 Measure at the valve opening you will flush with, and keep that opening the same for the whole flush.
🛡️ 15% is the recommended default for a fully open gravity drain.
🌊 With the valve partly open the flow is steadier, so 10% is usually enough.
🔒 Keep the valve opening the same for the whole flush — changing it changes the rate.
🕐 Shows the current time with seconds (HH:MM:SS) and ticks live.
📌 Tap “Set to now” to capture the current time — it then stays fixed, so the finish time does not keep moving.
👆 Tap the time itself to pick a different time with the clock (this also stops the live ticking).
▶️ Tap “Live” to resume the live clock.
The “Estimated Flushing Cleaning Finish” covers both flushing and cleaning: the cleaning is carried out during the flushing — the walls are scrubbed as the water drops, and the tank is scrubbed from the inside when the water is low. If in doubt, use a 20% safety buffer — that covers the cleaning time as well.
⚡ Refilling is faster than draining: the water comes in under PUB direct supply or transfer-pump pressure, so the flow is high and steady — unlike gravity draining, which slows as the level falls.
💧 The tank is empty after washing, so the water to refill is the Effective Volume.
⏱️ Measure the refill rate the same way as the drop rate — time how long 100 mm takes to rise on the indicator tube, or use a flow rate in m³/hr (or L/min).
🛡️ The same buffer % is added.
✅ The cleaning is done during the flushing, so no extra cleaning time is added between flushing and refilling.
⚠️ Turns vary by maker and design — the exact total is on the valve nameplate/datasheet or by counting on site (at Police Cantonment the 6" was 13 turns and the 8" was 36–37 turns, not 18/23).
🔄 How to count 1 full turn: start from fully closed, mark the handwheel at 12 o'clock, turn counter-clockwise; when the mark returns to 12 o'clock that is 1 full turn.
🛡️ Safety: tanks of 70 m³ or more — limit the first opening to 50%; open 100% only when the tank is below 10% capacity; check the siphonic roof drain pit is free of debris before opening; re-secure the vortex grating (aluminium cover) after draining.
💡 Why throttle: opening the valve gives very high flow from hydrostatic pressure, and with the vortex breaker removed the roof drain works by gravity only — the tailpipe reduction chokes and can cause air entrainment and flooding.